BACKGROUND

Baiteshowr, Siureni village is located  approximately 180 km from Kathmandu. It is situated on slope side of hill. As per our preliminary field survey conducted on 7th December 2019. it was found that the Baiteshwor Siureni village population are having drinking water scarcity problem to run their Daily life activities.

WATER DEMAND

During time of survey, with the conversation to the villagers of Baiteshowr, Paile village . We found that 4000 lit/hr of water is sufficient for 35 house holds. This design is based in accordance with the conversation held between our surveyor and the people of Baiteshowr, Paile  village.

WATER SOURCE

Water from nearest available source (mull) is sufficient to meet the demand of Kagune Agriculture. The water from the mull is sufficient for the proposed system.

PIPE LINE

 We recommend you to use 40 mm dia medium G.I Pipe 32 m and  40 mm dia HDPE pipe 800 m of 10 kg/ cm2 must be installed from the main source (mull) to desired delivery point.

The head difference of Source at mull and the top point Reservoir tank is approx. 100 meters and the total length to be about 1500 meters proposed pipe line is of   11/2”(30mm) size G.

 RESERVOIR TANK

Existing reservoir tank of 8 m3 and

PROPOSED INTAKE TANK

6000 Lit of HDPE tank 2 nos

Pipe lines:

Proposed 11/2” dia G.I Pipe 30 m

HDEP of 40 mm 10 kg/cm2 800m

Source tank

500 lit Hdep tank 2 nos with casing pipe and required accessories nearby water source.

Reservoir tank (Existing)

10.0 m3/hr

PRELIMINARY COST

 

Sn Details Qty Unit Rate Amount
1 HDEP Tank 6000 lit 11.50 69,000.00
2 40 mm dia HDEP pipes 6kg/cm2 800 mtr 130.00 104000.00
3 40 mm dia G.I Pipe 40 mtr 420.00 16,800.00
4 6”dia Casing pipe with required accessories 1 Set 22,000.00 22,000.00
5 Pipe and pipe fittings 1 Lot 12000.00 12,000.00
6 Installation testing commissioning all complete 1 Job 20,000.00 20,000.00
Total Amount 2,43,800.00

 

Terms and condition

  1. All the unskilled labor must be provided by the public.
  2. Transportation is included the above rates.

CONCLUSION

With the implementation of above suggested techniques, it can be assured that the Baiteshwor Paile  village, will have sufficient water for their day to day activities.

 

Thank you !!!

 

Start Time
9:00 am
March 10, 2020
Finish Time
5:00 pm
April 20, 2020
Address
Baiteshowr , Ward no 6, Siureni ( DALIT) Society in  Dolakha – Nepal.
Who come with us?
Jhalak Pakhrin
Jhalak Pakhrin
Executive Chairman
  • Total Slot: 100
  • Booked Time: 0
  • Booked Slot: 0
  • Cost: $50,00
Payment Via

Please contact us before registering event.

Leave a reply

Your email address will not be published.

Blog Categories

Projects Upcoming

10 April

Drinking water Supply Project – Rs. 240,000/- Rupee

Biateshwor , 3 - Tilkhoriya , Paile village - Doalakha
30 April

Sponsor to 55 Orphans & Poorest Children – $ USD

Baiteshwor Rural Municipality , Dolakha Nepal
17 April

House build for Kumar Nepali and Laxmi Nepali $ 1500 USD

Baiteshwor ward no. - 2, Dolakha Nepal
25 January

Become a volunteer

Join your hand with us for a better life and beautiful future.

Donate Today

Subscribe now and receive weekly newsletter with new events, interesting charity activities

    Support OUR Today at +9779851048101 or email help@socialnepal.org

    Ice Cap Adventure
    Sagun Social Organization